(613) 382-4719 brad@timechanical.net

This building has 3 ice pads, indoor soccer field and indoor tennis court. We supplied and installed the entire plumbing & HVAC system. Each ice pad was outfitted with its own designated ventilation/dehumidification units. The building was equipped with a hot water heating system which included hydronic in-floor heating, associated pumps and two condensing boilers. We also supplied and installed chillers, cooling towers, and associated mechanical pipe and duct insulation. Our firm subcontracted the BAS controls. The building had several different washroom facilities in which our firm supplied and installed the piping, plumbing fixtures, drinking fountains, and eye wash stations.